Thursday, February 22, 2007

**NEWSFLASH** Postpone Move in Date



For 1.5 months I've been a home-owner/ remodeler. A two month project is not likely....two weeks of sub-freezing weather and the fine details have pushed things back a little. Beauty is in the smaller details...i'm going to complete the major structural projects such as stairs, half walls, as well as the bathroom wall, shower and floors...then take a breathe, before focusing on the kitchen. That sounds like a lot to have done in the next week. Let's talk next week...Allison is going to be shocked at the progress...and we hope to do a bit of painting next weekend. But I've been wrong before.
Once or twice.

Thursday, February 1, 2007

It's going to snow tonight.

I'm glad i'm not in that damn house.


A few outdoor pictures before I go to bed.

Bathroom Floor plan.




There's nothing like smoking a fine cigar in a well laid out bathroom:) if i must say so myself. There is no bathroom right now. The new bathroom will pretty much be going where the old one was! Fitting a 6 foot wooden vanity, on dark bamboo floor (it's actually a grass, not wood), with 3x5 cream colored insert shower, and a small toilet room.


Looking pretty rough hey. Sure are nice dragonflys though.


Hope the moisture is not a concern with the bamboo flooring.
Oval bowl sinks--bought at a builder's auction.

Kitchen/Dining Room Floor Plan

Installing a new kitchen.

Basic floor plan, with 1 block equaling a foot...roughly. The kitchen is centered around a 91" window leading out to a nice view of the backyard. The front and patio entryways are matching pella glass doors. There are wooden floors in the kitchen; linoleum floor needs to be replaced in the mudroom- entryway area to the left of the 9x3 granite island.
Worries always with trying to figure out how far to put the countertops apart. Also, tough trying to find cabinetry, that works.
Double island, why not?

Tuesday, January 16, 2007

The Worst Floor Plan Ever, But Its Solid





10 Days In


Hello, welcome to my Lancaster County Ranch, welcome. Settlement was a week and a half ago. The first weekend, there was a small crew that assisted in ripping out staircase walls, the wall separating the kitchen and dining room, as well as completely demoing the bathroom. The results are fantastic with a splendid view out to the backyard. The second weekend after closing and days inbetween were spent organzing the huge mess made the first weekend and de-funking the walls and floor in the back bedrooms and hallway.