Chester Ensinger, 83 year old plasterer, sure may have known what he was doing, but man did he take his time. Contributed 16 hours. Check out that half wall and the new stairs. Whhhooop.
Thursday, March 29, 2007
Plasta-Mastas
Wednesday, March 28, 2007
Frame and Drywall
It's been a little over a month since my last post. Two weeks of framing and two weeks of drywalling (also put a roff on, see the next post). The bathroom, was framed out, the shower set, and the drywall hung and finished. The plaster ceiling gaps were a major difficulty along with a number of holes that had to be patched. Wheewww. It's going to be a nice bathroom...with a toilet room!!!
It Kitchen, had the stairs moved and a beutiful new stairway put in with a half wall that really opens the floor plan. The former wall between the kitchen and the dining room was framed into half wall with pictures framed out and then drywalled and finished. The hallway as well has been finished and a glass door will be put in when the finishing trim goes up.

A month until Allision moves in, the kitchen and bathroom need to be installed...and we're just about at that stage!!!!!!!!!!!!!! :)
It Kitchen, had the stairs moved and a beutiful new stairway put in with a half wall that really opens the floor plan. The former wall between the kitchen and the dining room was framed into half wall with pictures framed out and then drywalled and finished. The hallway as well has been finished and a glass door will be put in when the finishing trim goes up.
A month until Allision moves in, the kitchen and bathroom need to be installed...and we're just about at that stage!!!!!!!!!!!!!! :)